Preparing the Ho Chi Minh City Wastewater and Drainage System Improvement Project (TA 9205 VIE:)
Sector: Urban Development
Country: Vietnam
PRIMEX fielded an International Environment Expert who had the overall responsibility for environmental due diligence of the multi-tranche financing facility (MFF) program and the West Saigon catchment project. She also provided guidance to the National Environment Specialist and coordinated with the Resettlement Specialists and the Social, Gender, and Community Development Specialists to ensure consistency of the different safeguard plans. Her tasks included the following: (i) review of prevailing government regulations and ADB guidelines and policies governing the assessment and management of environmental impacts of projects; (ii) assessment of the capacity of the executing agency (EA) and design institutes for environmental assessment, management, and monitoring and recommendation of required measures for capacity building; (iii) provision of advice and training to the Project Management Unit (PMU) and the design institutes on ADB’s safeguard requirements as specified in the Safeguard Policy Statement (SPS), 2009; (iv) preparation of an environmental assessment and review framework (EARF) for the MFF project as a whole, fully responsive to the requirements defined in SPS (2009); (v) review of the domestic environmental impact assessment (EIA) prepared for the project, ensuring that it meets the requirements specified in ADB’s SPS (2009) to the extent possible; (vi) preparation of a project initial environment examination (IEE) and environmental management plan (EMP) for the West Saigon catchment project, following the format and contents specified in the annex to Appendix 1 of the SPS; (vii) development of an EMP that includes the proposed mitigation measures, environmental monitoring and reporting requirements, related institutional or organizational arrangements, public consultation and GRM, capacity development and training measures, implementation schedule, cost estimates, and performance indicators; (viii) assisting the EA to establish a project-level grievance redress mechanism (GRM0 covering formal and informal channels, addressing indigenous peoples’ (IP’s) needs (if relevant), based on the established project’s area of influence, and setting out the timeframe and mechanisms for resolving complaints about environmental performance; (ix) assisting the EA with stakeholder participation, consultation, and involvement during IEE/EMP/GRM preparation and disclosure of relevant information; (x) incorporation of findings of the health impact assessment (HIA) conducted by a third party and the climate risk and vulnerability assessment (CRVA) conducted by the climate change specialist in the IEE and EMP; and (xi) assisting in preparing the environmental safeguard inputs for the RRP and PAM, and contractor specifications for environmental management and monitoring.