Feasibility Study of the Mindanao Railway System Project

November 2015 - March 2018
Department of Economy, Planning, and Development (DEPDev) (formerly National Economic and Development Authority [NEDA])

Country: Philippines

PRIMEX provided the services of four specialists. The Deputy Project Manager assisted the Team Leader in the overall supervision of the various assessment study activities, assumed full responsibility, including leadership of the Consulting Team in the absence of the Team Leader, and took the lead in preparing the drafts of the Inception Report, VE/VA Report, Progress Report, Interim Report, Draft, and Final Report. The Geodetic Engineer handled the identification of new alignments, alternative alignments, alignment optimization plan and profile, and minor derivations from the present alignment, including bypasses around urban areas, and was in charge of all geodetic survey works necessary for the completion of the study. The Environmental/Social Assessment Specialist undertook a preliminary environmental/social assessment and mitigation measures for the project, consistent with the government’s requirements and estimated cost of the environmental/social mitigation plan, and the capability of the agency to implement the same. The Transport Economist and Financial Analyst determined economic costs and quantified economic benefits; undertook economic benefit and cost analysis and recommended the best financial model design for the project; determined possible financing sources and terms; and analyzed the economic and financial sensitivity of the project to possible increase or decrease of cost/revenue.