NEDA-sa-Makati Property Redevelopment Project

April 2021 - December 2022
PPPC

Country: Philippines

PRIMEX has fielded four key experts as part of the consultant team for this project: The Civil Engineer and the Architect are tasked to: (i) review the design of required infrastructure/facilities and provide advice as regards value engineering for the optimal layout, building capacity projections, and cost estimates of both in the construction and building management/maintenance; (ii) prepare the construction, supply, installation, and operation and maintenance performance standards; (iii) assist in the review of bid and contract documents of the building components of related PPP projects, including Invitation to Bid, Instruction to Bidders, and Draft Contracts; (iv) review and assist in the preparation of the MPSS; and (v) conduct the VE/OA. The IT/MIS Specialist is responsible for: (i) conduct of an initial assessment of integrated IT and information management needs and objectives of the Project, including its functional interface with other agencies, if any; (ii) develop a design of the integrated IT and information systems requirements for the Project which will identify the appropriate Information and Communication Technology (ICT) infrastructure and applications, processes, and procedures needed; (iii) develop the MPSS for the installation, operation and maintenance (O&M) of the IT infrastructure (hardware, software, and other associated infrastructure); (iv) prepare project cost estimate for the installation, O&M of IT systems, performance standards, management, and staffing for the IT/MIS, among others; and (v) assist in the preparation of the TOR for the IC. The Environmental Specialist will: (i) carry out a comprehensive environmental assessment and ensure substantive and forma-wise consistency with the documentary requirements for applying necessary national and local governments’ environmental permits, i.e., ECC, local clearances, etc.; (ii) assess critical environmental factors related to traffic congestion, noise and air, pollution, handling, storage and disposal of toxic and hazardous products, solid waste, water and flooding, carbon emissions, geo-hazard conditions, land use and settlement developments impacts and, resilience to climate change conditions such as storm surges and floods; (iii) recommend appropriate mitigating measures and designs to improve the project’s environmental sustainability. Ensure that the environmental management plan and mitigation measures are integrated in the project’s design, cost, and operation; (iv) identify all government environmental clearances, required permits, and approvals; (v) evaluate NEDA’s capacity to implement mitigation measures, and where necessary recommend capacity improvement training programs and measures; and (vi) ensure inclusion of the environmental management plan in the bidding documents, along with the requirements to comply with mitigation measures therein.