TA 7796-PHI: Mariveles Wellness Center Project (PPPC/ADB/IDCA/044)

August 2021 - December 2022
Public-Private-Partnership Center of the Philippines (PPPC)

Country: Philippines

PRIMEX fielded four key experts as part of the consultant team of the project: The Health and Wellness Operations Specialist was tasked to: (i) assist in conducting market analysis and demand estimation for the health services; (ii) develop the model covering the health facilities and complementary and alternative medicine (CAM) practices to be created, services that are needed and the services that need to be provided based on international and local CAM practices, technical standards and design of the project, cost estimation and cost recovery methods; (iii) review the requirements of accreditation by PhilHealth, PITAHC, domestic and global insurers to make the project, specifically the wellness center, an accredited facility with all the major health insurance players in the world; and (iv) prepare report on the assessment and/or construction valuation of operational viability of potential revenue-generating activities determined to be installed in the project. The Architect and the Civil Engineer are tasked to: (i) prepare and review the design of required infrastructure/facilities and provide advice as regards value engineering for the optimal layout, building capacity projections, and cost estimates of both in the construction and building management/maintenance; (ii) prepare the construction, supply, installation, and operation and maintenance (O&M) performance standards; (iii) assist in the review of bid and contract documents of the building components of related PPP projects, including Invitation to Bid, Instruction to Bidders, and Draft Contracts; (iv) review and assist in the preparation of the minimum performance standards and specifications (MPSS); and (v) conduct the VE/VA. And the Environmental Specialist is tasked to: (i) carry out a comprehensive environmental assessment and ensure substantive and forma-wise consistency with the documentary requirements for applying for necessary national and local governments’ environmental permits, i.e., ECC, local clearances, etc.; (ii) assess critical environmental factors related to traffic congestion, noise and air, pollution, handling, storage and disposal of toxic and hazardous products, solid waste, water and flooding, carbon emissions, geo-hazard conditions, land use and settlement developments impacts and, resilience to climate change conditions such as storm surges and floods; (iii) recommend appropriate mitigating measures and designs to improve the project’s environmental sustainability. Ensure that the environmental management plan and mitigation measures are integrated in the project’s design, cost, and operation; (iv) identify all government environmental clearances, required permits, and approvals; (v) evaluate NEDA’s capacity to implement mitigation measures, and where necessary recommend capacity improvement training programs and measures; and (vi) ensure inclusion of the environmental management plan in the bidding documents, along with the requirements to comply with mitigation measures therein.